FAA Approves Boeing Plan to Fix 787 Batteries

Mar 13, 2013 No Comments by

A Boeing plan to redesign the 787 Dreamliner’s fire-plagued lithium-ion batteries won approval Tuesday from the Federal Aviation Administration, moving the cutting-edge planes a step closer to flying passengers again.

The plan includes changes to the internal battery components to minimize the possibility of short-circuiting, which can lead to overheating and cause a fire. Among the changes are better insulation of the battery’s eight cells and the addition of a new containment and venting system, the FAA said in a statement.

The FAA statement didn’t provide an estimate for when the grounded planes might return to service. Rep. Rick Larsen, D-Wash., who was briefed by the agency, said that if all goes well, the FAA could give final approval by mid- to late April for the 787 to resume flight.

For the complete story by Joan Lowy and Joshua Freed of The Associated Press, click here.

Civilian, Featured News

About the author

Online Editor I've been around airplanes since I was a kid. That's when my uncle, a professional pilot, showed me how to fly his Cessna 177 Cardinal. l later became a writer and editor, so covering the exciting and ever-changing aviation industry -- which I've been doing in Flight Journal's Flybys since the late '90s -- was a natural fit.
No Responses to “FAA Approves Boeing Plan to Fix 787 Batteries”
Copyright © 2014 Air Age Media. All rights reserved.